OEM enterprise rack · eight 96GB GPUs
Enterprise 768
Eight high-memory Server Edition workers at the top of the PCIe range.
Eight RTX PRO 6000 Blackwell Server Edition GPU workers for large private platforms where independent services or tested sharding justify the facility requirements.
Current quotation and acceptance plan required.
Price, exact parts, compatibility, warranty, delivery and workload results are indicative until confirmed in a written quotation and acceptance record.
Key buying facts
Enterprise 768 at a glance
- Complete private AI deployment
- £189,999 ex VAT · final quotation required
- GPU configuration
- 8 × NVIDIA RTX PRO 6000 Blackwell 96GB 8 GPUs
- Per-GPU memory
- 96GB physical VRAM per GPU
- Physical GPU total
- 768GB across 8 GPUs · not automatically pooled
- Physical class
- Rack server GENOAX2 PCIe Gen5 4U enterprise rack platform
How the memory works: 768GB is the physical total across 8 separate 96GB GPUs. It is not automatically pooled; supported software may divide a model or workload across them, subject to topology and testing.
Power planning · Rack server
Dedicated high-capacity power required; exact input and measured wall power pending
Representative intended fit
A validated PCIe multi-GPU runtime
Buyer fit
Start with the reason to own it.
The highest PCIe worker tier before moving to tightly coupled frontier platforms.
Complete private AI deployment
£189,999
ex VAT · £227,999 inc VAT
Includes workload sizing, the configured system, AI software stack, security baseline, burn-in, agreed workload testing, documentation, remote onboarding and 30-day configuration-defect support.
Package figures exclude VAT and cover the stated GPU RIGS deployment scope. Every final order requires a written quotation confirming the specification, availability, delivery, warranty and workload acceptance plan.
A credible fit
- Eight high-memory endpoints or batch workers
- A validated PCIe multi-GPU runtime
- A data-centre-grade operating and support route
Choose another route when
- Four workers meet demand
- The workload requires an HGX fabric
- Power, cooling or support is unresolved
System evidence
What is confirmed, calculated and still unknown.
Vendor-documented values, calculations, assumptions and unknowns remain separate. A capability is marked as measured only when a reproducible benchmark exists.
- Commercial status
- indicative
- Reviewed
- Review again
- Open specification items
- 18
01 / model evidence
Exact checkpoint profiles
0 measured-supported profiles. A named model appears as supported only after the exact checkpoint, runtime, deployment and limits have a reproducible benchmark record.
Current boundary
No exact tested model-fit profile is listed for this system. GPU memory, a supplier capability statement or a model family name must not be read as a compatibility guarantee.
This does not mean that every model is unsupported. It means untested memory arithmetic or a generic GPU claim is not treated as a model match.
02 / workload acceptance
Beyond language models
Each workload needs its own quality, latency, throughput, stability and resource test. The entries below define what would be measured; they are not performance claims.
01
Retrieval-augmented generation
Retrieval quality, citation support, permissions, refusal behaviour and latency against a versioned corpus and question set; document count alone is not a hardware metric.
Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.
02
Software-engineering assistance
Task correctness, test pass rate, unsafe-change rate, reviewer effort and useful response time on a versioned repository evaluation set.
Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.
03
Speech to text
Word error rate, real-time factor and failure rate on a versioned, representative audio set.
Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.
04
Embedding
Vectors per second, query latency and retrieval-quality metric on a versioned corpus with the exact embedding checkpoint and dimensions.
Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.
05
Vision and OCR
Field accuracy or character error rate plus latency on a versioned, permission-safe image and document set.
Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.
06
Image generation
Latency percentiles, images per second, peak memory, stability and accepted-output rate at exact checkpoint, resolution, steps, sampler, CFG and batch.
Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.
07
Video generation
Clip latency, clips per hour, peak memory, stability and accepted-output rate at exact checkpoint, dimensions, frames, frame rate, duration, steps and batch.
Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.
08
GPU rendering
Frame latency, throughput, errors, wall power and temperature for an immutable scene using the exact renderer, version, resolution and sample count.
Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.
09
Fine-tuning
Completed steps, time, peak memory, loss and held-out evaluation result with exact base checkpoint, method, trainable parameters, dataset, sequence length and batch.
Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.
10
Language-model inference
Quality pass rate, TTFT, decode and aggregate throughput, latency percentiles, errors, memory, power and temperature at disclosed context, batch and concurrency.
Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.
03 / configuration
Specification with its certainty attached
The current sources show the basis for each value. The final quotation names the exact supplier, parts, warranty and bill of materials for the ordered system.
| Field | Public value | Evidence state | Qualification |
|---|---|---|---|
| Platform class | Eight-GPU high-memory PCIe Gen5 rack platform | Assumption | A planning assumption that must not be treated as a confirmed specification. |
| Chassis class | 4U 19-inch rack platform | Assumption | A planning assumption that must not be treated as a confirmed specification. |
| GPU route | 8 × NVIDIA RTX PRO 6000 Blackwell 96GB | Assumption | A planning assumption that must not be treated as a confirmed specification. Exact board part numbers and serials belong in the final bill of materials. |
| Physical GPU memory total | 768GB across 8 GPUs | Calculated | Calculated from disclosed inputs; not a measured system result. 768GB is the physical total across 8 separate 96GB GPUs. It is not automatically pooled; supported software may divide a model or workload across them, subject to topology and testing. |
| Per-GPU memory | 96GB | Vendor documented | Documented component capacity and the safer first sizing boundary before any supported multi-GPU test. |
| GPU interconnect | PCIe; no NVLink claim | Vendor documented | Documented by the component or platform vendor; not independently measured by GPU RIGS. The passive Server Edition is the controlled RTX PRO 6000 choice for the enterprise PCIe rack records. |
| System topology | 8 × 96GB Server Edition over PCIe Gen5; no NVLink claim | Assumption | A planning assumption that must not be treated as a confirmed specification. |
| CPU | Exact CPU and socket configuration pending supplier BOM | Unknown | Not yet evidenced for the ordered system and must be resolved before acceptance. |
| System memory | Exact system-memory capacity and population pending supplier BOM | Unknown | Not yet evidenced for the ordered system and must be resolved before acceptance. |
| Primary storage | Exact NVMe capacity, model, endurance and layout pending supplier BOM | Unknown | Not yet evidenced for the ordered system and must be resolved before acceptance. |
| Network | Exact network interfaces and fabric pending workload and supplier confirmation | Unknown | Not yet evidenced for the ordered system and must be resolved before acceptance. |
| Cooling | Forced-air rack cooling with eight passive Server Edition GPUs; validation pending | Assumption | A planning assumption that must not be treated as a confirmed specification. |
| GPU RIGS package figure | £189,999 ex VAT | Assumption | Complete GPU RIGS private AI deployment for the stated reference configuration. Final written quotation confirms exact parts, availability, delivery, warranty and accepted workload scope. |
04 / site and facility
The room stays inside the system boundary
Nameplate power, supplier cooling descriptions and aggregate GPU TDP are not a site approval. The exact build and customer facility need written acceptance.
- Input power
- Dedicated high-capacity power required; exact input and measured wall power pending Unknown Not yet evidenced for the ordered system and must be resolved before acceptance.
- Measured heat output
- Measured wall power and facility heat-rejection requirement pending reference build Unknown Not yet evidenced for the ordered system and must be resolved before acceptance.
- Cooling route
- Forced-air rack cooling with eight passive Server Edition GPUs; validation pending Assumption A planning assumption that must not be treated as a confirmed specification.
- Dimensions and handling
- Exact ordered-system dimensions and weight pending supplier BOM Unknown Not yet evidenced for the ordered system and must be resolved before acceptance.
- Facility acceptance
- Rack, power, airflow, heat rejection, noise, UPS and service access required Unknown The customer site has not been surveyed. The final ordered configuration and qualified facility design control this decision.
Pre-order site checks
- A suitable 19-inch rack, rail depth, handling route and secure operating location
- A qualified electrical design based on the final PSU population and measured load
- Cooling and heat-rejection capacity for sustained accelerator operation
- Appropriate switching, cabling, remote management and network segmentation
- A named operational owner or contracted support route
05 / delivery and support
A handover boundary, not an implied managed service
The final quotation must name who owns procurement, facility work, acceptance, warranty, remote support, recurring operations and any on-site service.
- Hardware warranty
- Exact whole-system, GPU, DOA, RMA, spares and on-site warranty route pending Unknown Not yet evidenced for the ordered system and must be resolved before acceptance. No supplier or GPU RIGS warranty term is promised by this planning record.
- Availability and lead time
- Build-to-order availability and lead time pending written supplier confirmation Unknown Not yet evidenced for the ordered system and must be resolved before acceptance. This record does not mean the product is stocked or orderable.
- GPU RIGS support baseline
- Remote onboarding and 30-day configuration-defect support Assumption The written quotation and contract confirm this service boundary. It is not a 24-hour managed service or an implied on-site warranty.
Standard service boundary
- Documented workload and site-fit review
- Confirmed bill of materials before procurement
- Configuration, burn-in and agreed smoke-test evidence
- Asset schedule, admin notes and user quick-start material
- Collection or the quoted kerbside or pallet-delivery route
- Remote onboarding and 30-day configuration-defect support
Separate scope or customer responsibility
- Building electrical work, rack, UPS, cooling or structured cabling
- Nationwide on-site installation unless separately quoted
- Migration of customer data, every integration or every application
- Continuous managed operations, security monitoring or a 24-hour support agreement
- Third-party model, API, marketplace or software charges
- A compliance certificate, performance guarantee or income guarantee
06 / sources and review status
Sources and unresolved items
Review dates show evidence freshness, not future availability. A current quote, serialised bill of materials and accepted test record control the order.
- Commercial state
- indicative
- Reviewed
- 2026-07-28
- Review again
- 2026-08-28
Unresolved before acceptance
- Platform class: Eight-GPU high-memory PCIe Gen5 rack platform
- Chassis class: 4U 19-inch rack platform
- GPU route: 8 × NVIDIA RTX PRO 6000 Blackwell 96GB
- System topology: 8 × 96GB Server Edition over PCIe Gen5; no NVLink claim
- CPU: Exact CPU and socket configuration pending supplier BOM
- System memory: Exact system-memory capacity and population pending supplier BOM
- Primary storage: Exact NVMe capacity, model, endurance and layout pending supplier BOM
- Network: Exact network interfaces and fabric pending workload and supplier confirmation
- Cooling: Forced-air rack cooling with eight passive Server Edition GPUs; validation pending
- GPU RIGS package figure: £189,999 ex VAT
- Input power: Dedicated high-capacity power required; exact input and measured wall power pending
- Measured heat output: Measured wall power and facility heat-rejection requirement pending reference build
- Cooling route: Forced-air rack cooling with eight passive Server Edition GPUs; validation pending
- Dimensions and handling: Exact ordered-system dimensions and weight pending supplier BOM
- Facility acceptance: Rack, power, airflow, heat rejection, noise, UPS and service access required
- Hardware warranty: Exact whole-system, GPU, DOA, RMA, spares and on-site warranty route pending
- Availability and lead time: Build-to-order availability and lead time pending written supplier confirmation
- GPU RIGS support baseline: Remote onboarding and 30-day configuration-defect support
-
Product record
Current product specification and commercial status
GPU RIGS
Retrieved 2026-07-28 · reviewed 2026-07-28
The current product record defines the specification and commercial status shown on this page.
-
Retrieved 2026-07-28 · reviewed 2026-07-28
Use the linked source to confirm the dated component, platform or checkpoint facts stated above.
-
Supplier reference
Dated supplier configuration evidence
System supplier
Retrieved 2026-07-28 · reviewed 2026-07-28
Dated supplier evidence. Configuration, stock, price and warranty require confirmation in the final quotation.
Known limitations
- 768GB is aggregate capacity across eight 96GB GPUs.
- This is a PCIe architecture, not an HGX system and not one pooled 768GB memory space.
- No Kimi K3 fit, context, throughput, concurrency or fine-tuning result has been measured.
- 768GB is aggregate capacity across eight 96GB GPUs.
- This is a PCIe architecture, not an HGX system and not one pooled 768GB memory space.
- No Kimi K3 fit, context, throughput, concurrency or fine-tuning result has been measured.
- Aggregate GPU memory is not one universal memory pool.
- No model, speed, context, concurrency or multi-GPU efficiency promise exists without a controlled fit profile.
- Rack, electrical work, UPS, cooling, cabling, colocation and on-site installation require a separate scope.
Do not buy this route when
- The workload depends on HGX-class interconnect bandwidth.
- A smaller appliance or hosted burst capacity better matches utilisation.
- The site cannot support dense 4U power, airflow, noise and service access.
Inspect the evidence behind Enterprise 768.
The system view shows the selected hardware reference where available. Technical diagrams explain memory, data boundaries, queues, power and handover. The final bill of materials and workload test confirm the ordered system.
Software and security
The usable product is more than the chassis.
The final stack stays deliberately small. Versions, licences, access and recurring ownership are recorded so the customer is not left with an opaque collection of containers.
Software baseline
- Ubuntu LTS on a recorded operating-system version
- NVIDIA driver, CUDA components and container support validated for the ordered hardware
- Docker Engine and NVIDIA Container Toolkit
- One primary model server selected from Ollama, vLLM, SGLang, TensorRT-LLM or llama.cpp for the accepted workload
- Open WebUI or another reviewed browser interface
- Named authentication, TLS and reverse-proxy approach
- GPU, node and service monitoring with an agreed log-retention period
- Pinned versions, a software bill of materials and a model source and licence record
Security ownership
- GPU RIGS baseline
- Initial operating-system state, named administrator handover, host firewall baseline, agreed access route, secrets transfer and documented update state.
- Customer or contracted operator
- User lifecycle, network and VPN policy, backups, monitoring review, patch approval, incident response, data governance and lawful use.
- Shared before acceptance
- Model and software licence checks, retention and logging choices, recovery test, acceptance criteria and a named owner for every recurring task.
Local infrastructure can reduce disclosure to external AI APIs. It does not automatically make the service secure, accurate, confidential or UK GDPR compliant.
Testing and acceptance
The evidence pack is part of the machine.
Performance is confirmed against the accepted workload, exact build and disclosed test conditions. No throughput, latency or quality figure is claimed before that test.
- 01
Record the final bill of materials, serial numbers and firmware versions.
- 02
Run at least 24 hours of GPU, CPU, memory and storage stress testing.
- 03
Capture temperature, fan, error, health and wall-power evidence under the agreed load.
- 04
Test cold boot, restart and the available remote-management route.
- 05
Check drive health, network throughput and the container and GPU runtime.
- 06
Run model and workload smoke tests against the written acceptance set.
- 07
Record any measured speed only with the model, quantisation, context, concurrency and runtime disclosed.
- 08
Test an agreed fault or recovery route and provide the resulting handover record.
What is not claimed today
No fixed users, tokens per second, latency, model size, accuracy, availability, savings or marketplace contribution is stated without the missing configuration and test conditions.
See how systems are testedCommercial reality
Tax and spare capacity are supporting questions.
Neither belongs in a guaranteed saving or payback claim. The purchase must stand on the accepted workload, control case and operating plan.
Finance, VAT and capital allowances
- The displayed figure is for a complete GPU RIGS private AI deployment, not unconfigured hardware. The final written quotation confirms the exact specification, delivery, warranty and accepted workload scope.
- Prices exclude VAT. VAT recovery depends on the buyer, its taxable activities and the normal evidence rules.
- Qualifying equipment may be plant and machinery for capital-allowance purposes. The buyer's accountant decides eligibility and timing.
- A third-party lease or hire-purchase route may be explored after partner validation and credit approval. GPU RIGS is not presented as a lender.
- There is no generic capital-gains advantage and no automatic research and development relief because the equipment supports AI.
Optional idle capacity
- Marketplace mode is off by default and is excluded from the purchase case.
- A separate environment, no customer data mounts, network controls and a local kill switch would be required.
- The customer, insurer, supplier warranty and marketplace terms must permit the intended use.
- Vast.ai, Render, Golem and direct batch work do not guarantee acceptance, demand, rate or income.
- Any dated estimate must identify its source date; a pilot must report achieved utilisation, fees, electricity, cooling, faults and operator time.
Limits and alternatives
A good specification leaves room for “no”.
The fit check can recommend a smaller system, hosted service, hybrid route, custom build or no purchase. That is preferable to making this package carry a workload it has not proved.
Package boundaries
- Aggregate GPU memory is not one universal memory pool.
- No model, speed, context, concurrency or multi-GPU efficiency promise exists without a controlled fit profile.
- Rack, electrical work, UPS, cooling, cabling, colocation and on-site installation require a separate scope.
- 768GB is aggregate capacity across eight 96GB GPUs.
- This is a PCIe architecture, not an HGX system and not one pooled 768GB memory space.
- No Kimi K3 fit, context, throughput, concurrency or fine-tuning result has been measured.
- Aggregate GPU memory is not one universal memory pool.
- No model, speed, context, concurrency or multi-GPU efficiency promise exists without a controlled fit profile.
- Rack, electrical work, UPS, cooling, cabling, colocation and on-site installation require a separate scope.
Choose the smaller system when it meets the accepted workload and resilience requirement.
Consider this route Custom specificationUse when storage, network, resilience, colocation or service design differs from the reference route.
Consider this route Hosted or hybrid AIMay be preferable for bursty demand or where the organisation cannot own the facility and operating burden.
Consider this routeQuestions answered
Enterprise 768 questions that affect the order
The written quotation and acceptance plan confirm any price, specification, warranty or workload assumption discussed below.
Does Enterprise 768 provide 768GB as one memory pool?
Only a single-GPU system provides its stated GPU memory on one card. Multi-GPU totals are aggregate physical capacity; usable sharding depends on the exact model, runtime and topology.
Which models are supported?
Only models with a reproducible fit profile are listed as supported. Capacity candidates are labelled separately; a memory calculation alone is not a support claim.
Is the displayed price final?
No. An indicative price is a transparent planning value based on dated inputs. Quote-only platforms and the final order require a current supplier quote, accepted bill of materials and delivery scope.
Can spare capacity earn income?
It may be evaluated as an optional isolated secondary use. Marketplace acceptance, utilisation, rates, fees, energy and income can change and are never guaranteed or included in the purchase case.
Prepare the next decision
Specify the work before the parts.
Record the workload, data boundary, users, site and acceptance test. No confidential documents or credentials are needed for the first brief.
Package figures exclude VAT and cover the stated GPU RIGS deployment scope. Every final order requires a written quotation confirming the specification, availability, delivery, warranty and workload acceptance plan.