SME workstation · two professional 96GB GPUs

Studio 192

Two high-memory professional workers where a rack cannot be installed.

A supplier-validated dual RTX PRO tower for studios and technical teams, explicitly treated as 192GB aggregate capacity rather than one pooled memory space.

Current quotation and acceptance plan required.

Price, exact parts, compatibility, warranty, delivery and workload results are indicative until confirmed in a written quotation and acceptance record.

Supplier reference / final build quoted
RTX PRO dual-GPU workstation selected as the Studio 192 reference
Inspect the platform
2 × 96GB GPU memory · 192GB physical total, not automatically pooled Dual-GPU professional AI workstation reference platform GPU configuration 2 × NVIDIA RTX PRO 6000 Blackwell 96GB Image status Selected supplier product reference · exact ordered parts and appearance require confirmation Memory use 192GB is the physical total across 2 separate 96GB GPUs. It is not automatically pooled; supported software may divide a model or workload across them, subject to topology and testing.

Key buying facts

Studio 192 at a glance

Complete private AI deployment
£42,000 ex VAT · final quotation required
GPU configuration
2 × NVIDIA RTX PRO 6000 Blackwell 96GB 2 GPUs
Per-GPU memory
96GB physical VRAM per GPU
Physical GPU total
192GB across 2 GPUs · not automatically pooled
Physical class
Workstation Dual-GPU professional AI workstation

How the memory works: 192GB is the physical total across 2 separate 96GB GPUs. It is not automatically pooled; supported software may divide a model or workload across them, subject to topology and testing.

Power planning · Workstation

Exact dual-GPU PSU, circuit and measured wall-power requirement pending

Representative intended fit

A validated dual-GPU runtime and topology

Buyer fit

Start with the reason to own it.

The highest workstation tier, reserved for a proven two-worker or qualified multi-GPU requirement.

Complete private AI deployment

£42,000

ex VAT · £50,400 inc VAT

Includes workload sizing, the configured system, AI software stack, security baseline, burn-in, agreed workload testing, documentation, remote onboarding and 30-day configuration-defect support.

Package figures exclude VAT and cover the stated GPU RIGS deployment scope. Every final order requires a written quotation confirming the specification, availability, delivery, warranty and workload acceptance plan.

A credible fit

  • Two independent high-memory professional GPU services
  • A validated dual-GPU runtime and topology
  • A site that can safely accept a high-power floor-standing system

Choose another route when

  • One 96GB GPU passes the workload acceptance test
  • Enterprise rack serviceability or density is required
  • The office cannot accept the final electrical, heat or noise envelope

System evidence

What is confirmed, calculated and still unknown.

Vendor-documented values, calculations, assumptions and unknowns remain separate. A capability is marked as measured only when a reproducible benchmark exists.

Commercial status
indicative
Reviewed
Review again
Open specification items
8
Measured / confirmedVendor documentedCalculatedExternal estimateAssumptionUnknownUnsupported

01 / model evidence

Exact checkpoint profiles

0 measured-supported profiles. A named model appears as supported only after the exact checkpoint, runtime, deployment and limits have a reproducible benchmark record.

Current boundary

No exact tested model-fit profile is listed for this system. GPU memory, a supplier capability statement or a model family name must not be read as a compatibility guarantee.

No tested model match is listed for this system.

This does not mean that every model is unsupported. It means untested memory arithmetic or a generic GPU claim is not treated as a model match.

02 / workload acceptance

Beyond language models

Each workload needs its own quality, latency, throughput, stability and resource test. The entries below define what would be measured; they are not performance claims.

01

Retrieval-augmented generation

Retrieval quality, citation support, permissions, refusal behaviour and latency against a versioned corpus and question set; document count alone is not a hardware metric.

Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.

02

Software-engineering assistance

Task correctness, test pass rate, unsafe-change rate, reviewer effort and useful response time on a versioned repository evaluation set.

Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.

03

Speech to text

Word error rate, real-time factor and failure rate on a versioned, representative audio set.

Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.

04

Embedding

Vectors per second, query latency and retrieval-quality metric on a versioned corpus with the exact embedding checkpoint and dimensions.

Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.

05

Image generation

Latency percentiles, images per second, peak memory, stability and accepted-output rate at exact checkpoint, resolution, steps, sampler, CFG and batch.

Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.

06

GPU rendering

Frame latency, throughput, errors, wall power and temperature for an immutable scene using the exact renderer, version, resolution and sample count.

Acceptance definition only. No performance, quality, capacity or suitability result has been measured for this system.

03 / configuration

Specification with its certainty attached

The current sources show the basis for each value. The final quotation names the exact supplier, parts, warranty and bill of materials for the ordered system.

Studio 192 specification and evidence status
Field Public value Evidence state Qualification
Platform class Dual-GPU professional AI workstation Vendor documented Documented by the component or platform vendor; not independently measured by GPU RIGS. the selected supplier does not identify the exact Workstation versus Max-Q board edition on the public product page; the ordered board SKU remains a quote gate.
Chassis class Full-tower professional workstation Vendor documented Documented by the component or platform vendor; not independently measured by GPU RIGS.
GPU route 2 × NVIDIA RTX PRO 6000 Blackwell 96GB Vendor documented Documented by the component or platform vendor; not independently measured by GPU RIGS. Exact board part numbers and serials belong in the final bill of materials.
Physical GPU memory total 192GB across 2 GPUs Calculated Calculated from disclosed inputs; not a measured system result. 192GB is the physical total across 2 separate 96GB GPUs. It is not automatically pooled; supported software may divide a model or workload across them, subject to topology and testing.
Per-GPU memory 96GB Vendor documented Documented component capacity and the safer first sizing boundary before any supported multi-GPU test.
GPU interconnect PCIe; no NVLink claim Vendor documented Documented by the component or platform vendor; not independently measured by GPU RIGS. This active-cooled Max-Q edition is restricted to workstation records and must not be used in enterprise rack records. the selected supplier's exact dual-96GB product page does not name the board edition, so the ordered SKU remains unconfirmed.
System topology 2 × 96GB over PCIe; no pooled-memory or NVLink claim Vendor documented Documented by the component or platform vendor; not independently measured by GPU RIGS. the selected supplier explicitly lists NVLink as absent. Runtime-specific sharding remains unvalidated.
CPU AMD Ryzen Threadripper 9960X, 24 cores / 48 threads Vendor documented Documented by the component or platform vendor; not independently measured by GPU RIGS.
System memory 128GB ECC DDR5 Vendor documented Documented by the component or platform vendor; not independently measured by GPU RIGS.
Primary storage 2TB PCIe 5.0 NVMe SSD Vendor documented Documented by the component or platform vendor; not independently measured by GPU RIGS.
Network 10GbE and 2.5GbE Ethernet Vendor documented Documented by the component or platform vendor; not independently measured by GPU RIGS.
Cooling Active-air Max-Q workstation cooling; reference-build validation pending Vendor documented Documented by the component or platform vendor; not independently measured by GPU RIGS.
GPU RIGS package figure £42,000 ex VAT Assumption Complete GPU RIGS private AI deployment for the stated reference configuration. Final written quotation confirms exact parts, availability, delivery, warranty and accepted workload scope.

04 / site and facility

The room stays inside the system boundary

Nameplate power, supplier cooling descriptions and aggregate GPU TDP are not a site approval. The exact build and customer facility need written acceptance.

Input power
Exact dual-GPU PSU, circuit and measured wall-power requirement pending Unknown Not yet evidenced for the ordered system and must be resolved before acceptance.
Measured heat output
Measured wall power and facility heat-rejection requirement pending reference build Unknown Not yet evidenced for the ordered system and must be resolved before acceptance.
Cooling route
Active-air Max-Q workstation cooling; reference-build validation pending Vendor documented Documented by the component or platform vendor; not independently measured by GPU RIGS.
Dimensions and handling
Exact ordered-system dimensions and weight pending supplier BOM Unknown Not yet evidenced for the ordered system and must be resolved before acceptance.
Facility acceptance
Office placement still requires circuit, heat and noise acceptance Unknown The customer site has not been surveyed. The final ordered configuration and qualified facility design control this decision.

Pre-order site checks

  • A ventilated floor or desk-side position with clear intake and exhaust paths
  • A suitable UK circuit and an agreed UPS decision after measured-load review
  • An acoustic and heat check under the accepted workload
  • A named owner for accounts, updates, backups and incident response

05 / delivery and support

A handover boundary, not an implied managed service

The final quotation must name who owns procurement, facility work, acceptance, warranty, remote support, recurring operations and any on-site service.

Hardware warranty
Exact whole-system, GPU, DOA, RMA, spares and on-site warranty route pending Unknown Not yet evidenced for the ordered system and must be resolved before acceptance. No supplier or GPU RIGS warranty term is promised by this planning record.
Availability and lead time
Build-to-order availability and lead time pending written supplier confirmation Unknown Not yet evidenced for the ordered system and must be resolved before acceptance. This record does not mean the product is stocked or orderable.
GPU RIGS support baseline
Remote onboarding and 30-day configuration-defect support Assumption The written quotation and contract confirm this service boundary. It is not a 24-hour managed service or an implied on-site warranty.

Standard service boundary

  • Documented workload and site-fit review
  • Confirmed bill of materials before procurement
  • Configuration, burn-in and agreed smoke-test evidence
  • Asset schedule, admin notes and user quick-start material
  • Collection or the quoted kerbside or pallet-delivery route
  • Remote onboarding and 30-day configuration-defect support

Separate scope or customer responsibility

  • Building electrical work, rack, UPS, cooling or structured cabling
  • Nationwide on-site installation unless separately quoted
  • Migration of customer data, every integration or every application
  • Continuous managed operations, security monitoring or a 24-hour support agreement
  • Third-party model, API, marketplace or software charges
  • A compliance certificate, performance guarantee or income guarantee

06 / sources and review status

Sources and unresolved items

Review dates show evidence freshness, not future availability. A current quote, serialised bill of materials and accepted test record control the order.

Commercial state
indicative
Reviewed
2026-07-28
Review again
2026-08-28

Unresolved before acceptance

  • GPU RIGS package figure: £42,000 ex VAT
  • Input power: Exact dual-GPU PSU, circuit and measured wall-power requirement pending
  • Measured heat output: Measured wall power and facility heat-rejection requirement pending reference build
  • Dimensions and handling: Exact ordered-system dimensions and weight pending supplier BOM
  • Facility acceptance: Office placement still requires circuit, heat and noise acceptance
  • Hardware warranty: Exact whole-system, GPU, DOA, RMA, spares and on-site warranty route pending
  • Availability and lead time: Build-to-order availability and lead time pending written supplier confirmation
  • GPU RIGS support baseline: Remote onboarding and 30-day configuration-defect support
  1. Product record

    Current product specification and commercial status

    GPU RIGS

    Retrieved 2026-07-28 · reviewed 2026-07-28

    The current product record defines the specification and commercial status shown on this page.

  2. Product record

    Current product specification and commercial status

    GPU RIGS

    Retrieved 2026-07-28 · reviewed 2026-07-28

    The current product record defines the specification and commercial status shown on this page.

  3. Supplier reference

    Dated supplier configuration evidence

    System supplier

    Retrieved 2026-07-28 · reviewed 2026-07-28

    Dated supplier evidence. Configuration, stock, price and warranty require confirmation in the final quotation.

  4. Official component/platform record

    NVIDIA RTX PRO 6000 Blackwell family

    NVIDIA

    Retrieved 2026-07-28 · reviewed 2026-07-28

    Use the linked source to confirm the dated component, platform or checkpoint facts stated above.

  5. Supplier reference

    Dated supplier configuration evidence

    System supplier

    Retrieved 2026-07-28 · reviewed 2026-07-28

    Dated supplier evidence. Configuration, stock, price and warranty require confirmation in the final quotation.

Known limitations

  • 192GB is aggregate capacity across two 96GB GPUs, not one universal memory pool.
  • No dual-GPU topology, model fit, cooling, acoustic or performance result has been measured.
  • 192GB is aggregate capacity across two 96GB GPUs, not one universal memory pool.
  • No dual-GPU topology, model fit, cooling, acoustic or performance result has been measured.
  • 192GB is aggregate capacity across two 96GB GPUs; no NVLink or universal pooling claim is made.
  • A workstation is not presented as a redundant datacentre appliance.
  • No model, speed, context, concurrency or output-quality promise exists without a controlled fit profile.
  • Public supplier price and availability observations are dated inputs, not reserved stock.

Do not buy this route when

  • The workload needs enterprise rack serviceability, density or passive server GPUs.
  • One 96GB worker or a lower-cost route meets the accepted workload.
  • The office cannot support the final electrical, heat and noise envelope.

Inspect the evidence behind Studio 192.

The system view shows the selected hardware reference where available. Technical diagrams explain memory, data boundaries, queues, power and handover. The final bill of materials and workload test confirm the ordered system.

Diagram combining model weights, context, cache and active requests into a memory headroom check
Diagram combining model weights, context, cache and active requests into a memory headroom check
Memory fit depends on the workload, context, cache and simultaneous demand, then needs a representative test. GPU Servers technical illustration.
Memory fit depends on the workload, context, cache and simultaneous demand, then needs a representative test. GPU Servers technical illustration.
Diagram showing jobs entering a queue, being assigned to independent workers and producing measured outputs
Diagram showing jobs entering a queue, being assigned to independent workers and producing measured outputs
Queued rendering, batch and coding work can be divided between workers, with waiting time and failures measured. GPU Servers technical illustration.
Queued rendering, batch and coding work can be divided between workers, with waiting time and failures measured. GPU Servers technical illustration.
Diagram of cool air entering a rack server, heat leaving it and checks for the circuit, room and meter
Diagram of cool air entering a rack server, heat leaving it and checks for the circuit, room and meter
Power, airflow and room conditions form one site-readiness decision rather than three separate afterthoughts. GPU Servers technical illustration.
Power, airflow and room conditions form one site-readiness decision rather than three separate afterthoughts. GPU Servers technical illustration.
Diagram of an evidence pack containing an asset schedule, burn-in record, health readings, workload test and admin guide
Diagram of an evidence pack containing an asset schedule, burn-in record, health readings, workload test and admin guide
A credible handover records the supplied assets, checks, operating evidence, instructions and unresolved items. GPU Servers technical illustration.
A credible handover records the supplied assets, checks, operating evidence, instructions and unresolved items. GPU Servers technical illustration.

Software and security

The usable product is more than the chassis.

The final stack stays deliberately small. Versions, licences, access and recurring ownership are recorded so the customer is not left with an opaque collection of containers.

Software baseline

  1. Ubuntu LTS on a recorded operating-system version
  2. NVIDIA driver, CUDA components and container support validated for the ordered hardware
  3. Docker Engine and NVIDIA Container Toolkit
  4. One primary model server selected from Ollama, vLLM, SGLang, TensorRT-LLM or llama.cpp for the accepted workload
  5. Open WebUI or another reviewed browser interface
  6. Named authentication, TLS and reverse-proxy approach
  7. GPU, node and service monitoring with an agreed log-retention period
  8. Pinned versions, a software bill of materials and a model source and licence record

Security ownership

GPU RIGS baseline
Initial operating-system state, named administrator handover, host firewall baseline, agreed access route, secrets transfer and documented update state.
Customer or contracted operator
User lifecycle, network and VPN policy, backups, monitoring review, patch approval, incident response, data governance and lawful use.
Shared before acceptance
Model and software licence checks, retention and logging choices, recovery test, acceptance criteria and a named owner for every recurring task.

Local infrastructure can reduce disclosure to external AI APIs. It does not automatically make the service secure, accurate, confidential or UK GDPR compliant.

Testing and acceptance

The evidence pack is part of the machine.

Performance is confirmed against the accepted workload, exact build and disclosed test conditions. No throughput, latency or quality figure is claimed before that test.

  1. 01

    Record the final bill of materials, serial numbers and firmware versions.

  2. 02

    Run at least 24 hours of GPU, CPU, memory and storage stress testing.

  3. 03

    Capture temperature, fan, error, health and wall-power evidence under the agreed load.

  4. 04

    Test cold boot, restart and the available remote-management route.

  5. 05

    Check drive health, network throughput and the container and GPU runtime.

  6. 06

    Run model and workload smoke tests against the written acceptance set.

  7. 07

    Record any measured speed only with the model, quantisation, context, concurrency and runtime disclosed.

  8. 08

    Test an agreed fault or recovery route and provide the resulting handover record.

What is not claimed today

No fixed users, tokens per second, latency, model size, accuracy, availability, savings or marketplace contribution is stated without the missing configuration and test conditions.

See how systems are tested

Commercial reality

Tax and spare capacity are supporting questions.

Neither belongs in a guaranteed saving or payback claim. The purchase must stand on the accepted workload, control case and operating plan.

Finance, VAT and capital allowances

  • The displayed figure is for a complete GPU RIGS private AI deployment, not unconfigured hardware. The final written quotation confirms the exact specification, delivery, warranty and accepted workload scope.
  • Prices exclude VAT. VAT recovery depends on the buyer, its taxable activities and the normal evidence rules.
  • Qualifying equipment may be plant and machinery for capital-allowance purposes. The buyer's accountant decides eligibility and timing.
  • A third-party lease or hire-purchase route may be explored after partner validation and credit approval. GPU RIGS is not presented as a lender.
  • There is no generic capital-gains advantage and no automatic research and development relief because the equipment supports AI.
Read the guarded UK buyer notes

Optional idle capacity

  • Marketplace mode is off by default and is excluded from the purchase case.
  • A separate environment, no customer data mounts, network controls and a local kill switch would be required.
  • The customer, insurer, supplier warranty and marketplace terms must permit the intended use.
  • Vast.ai, Render, Golem and direct batch work do not guarantee acceptance, demand, rate or income.
  • Any dated estimate must identify its source date; a pilot must report achieved utilisation, fees, electricity, cooling, faults and operator time.
Review the marketplace decision gate

Limits and alternatives

A good specification leaves room for “no”.

The fit check can recommend a smaller system, hosted service, hybrid route, custom build or no purchase. That is preferable to making this package carry a workload it has not proved.

Package boundaries

  • A workstation is not presented as a redundant datacentre appliance.
  • No model, speed, context, concurrency or output-quality promise exists without a controlled fit profile.
  • Public supplier price and availability observations are dated inputs, not reserved stock.
  • 192GB is aggregate capacity across two 96GB GPUs, not one universal memory pool.
  • No dual-GPU topology, model fit, cooling, acoustic or performance result has been measured.
  • 192GB is aggregate capacity across two 96GB GPUs; no NVLink or universal pooling claim is made.
  • A workstation is not presented as a redundant datacentre appliance.
  • No model, speed, context, concurrency or output-quality promise exists without a controlled fit profile.
  • Public supplier price and availability observations are dated inputs, not reserved stock.

Questions answered

Studio 192 questions that affect the order

The written quotation and acceptance plan confirm any price, specification, warranty or workload assumption discussed below.

Does Studio 192 provide 192GB as one memory pool?

Only a single-GPU system provides its stated GPU memory on one card. Multi-GPU totals are aggregate physical capacity; usable sharding depends on the exact model, runtime and topology.

Which models are supported?

Only models with a reproducible fit profile are listed as supported. Capacity candidates are labelled separately; a memory calculation alone is not a support claim.

Is the displayed price final?

No. An indicative price is a transparent planning value based on dated inputs. Quote-only platforms and the final order require a current supplier quote, accepted bill of materials and delivery scope.

Can spare capacity earn income?

It may be evaluated as an optional isolated secondary use. Marketplace acceptance, utilisation, rates, fees, energy and income can change and are never guaranteed or included in the purchase case.

Prepare the next decision

Specify the work before the parts.

Record the workload, data boundary, users, site and acceptance test. No confidential documents or credentials are needed for the first brief.

Package figures exclude VAT and cover the stated GPU RIGS deployment scope. Every final order requires a written quotation confirming the specification, availability, delivery, warranty and workload acceptance plan.